Assembling the cabin parts in a prepared spot, connecting water and waste and sealing the joints costs from €125. The cabin itself, new pipe runs and building in a floor drain are not in this price.
Frame and tray seen from the inside
The maker Arcade states for its sliding shower doors that the cabin frame must not be sealed to the tray from the inside. If it is, water that has got into the frame profile cannot return to the tray, and a leak outside the cabin can result.
Frame profiles usually have openings at the bottom through which water drains back onto the tray. A silicone bead on the inside can block them, and the water then runs out onto the floor. Other models may have different maker’s requirements, so check the sealing points in the instructions for your cabin.
Tiles, grout and tray before the cabin
Arcade also sets out the order: tiling and grouting must be finished before assembly, and the tray must be level and sealed to the tiles. The silicone is left to cure for 24 hours before the shower is used.
- Tiles and grout
- finished and hardened, because the cabin profiles are screwed to the completed wall.
- Tray
- level, otherwise the doors may slide unevenly and water may not run to the waste.
- Joint between tray and tiles
- sealed before the cabin goes in, because it is hard to reach afterwards.
Assembly instructions for Arcade sliding shower doors, checked 25 November 2026. Other makers and models may have different requirements. Tiling and waterproofing are not part of the cabin installation price.
A frameless glass wall
A frameless glass shower corner needs a different wall from a cabin on a tray. For example, RAVAK requires a firm, solid, vertical wall for its Glassline corner, with adjoining walls at a right angle. When glass panels are moved, soft material has to stay under the bottom edge.
- Spacers
- hinges and handles are never fitted with metal directly against glass; the protective spacers and plastic washers from the set are needed.
- Torque
- glass joints with brackets and hinges are tightened to 4-5 Nm and checked again after adjustment.
- Adjustment
- on this model the door position can be changed by ± 6 mm by loosening the brackets of the fixed glass wall until the top edges of the panes are level.
RAVAK Glassline GSRV4 assembly instructions, viewed 25 November 2026. Sizes and tightening torques differ on other models.
Where leaks arise in the shower area
For example, in a Swedish water damage survey for 2018, the most common causes of bathroom and shower leaks were these:
- Floor waterproofing
- 22% of cases.
- Pipes
- 21% of cases.
- Waterproofing connection to the floor drain
- 15% of cases.
These are not Latvian statistics, but all three leading causes in them lie in the floor, the pipes or at the floor drain, not in the cabin glass or doors. So before the cabin is assembled, make sure the drain connection has been made to its maker’s instructions.
Cabin on a tray or a floor drain
The price from €125 applies to a cabin whose spot is prepared and already has water and waste outlets. If the shower needs a floor drain, building it in is a separate job with no single price. It depends on the floor construction and height, where the sewer branch runs and how the waterproofing work is divided. The complexity of the cabin, the tray height and the position of the supplies also change the assembly price.
A simple corner cabin with doors on a tray and a cabin with a roof, side jets or electrics are jobs of very different size. The more parts, connections and sealed joints, the longer the assembly, and cabin complexity is the first factor that changes the price.