So a damp patch by the pipe shaft after a downpour may come from the roof drain, not from the soil stack. Beside these blocks the neighbourhood also has small family houses with plumbing of their own, quite different.
A roof water pipe inside the building
A Wikipedia overview of standard residential building types describes 103 series blocks as having a basement and a flat roof drained by an internal system, and this series occurs in Dārzciems. It means one more vertical pipe runs through the building from roof to basement, neither water supply nor domestic sewer. Rain and snowmelt flow through it, and it belongs to the whole building, like the roof. If it gets blocked somewhere with leaves or sand, water may collect on the roof and look for another way.
If damp appears by the shaft or on a ceiling, the first question is timing. A seep from the rainwater pipe usually shows after rain or a thaw and dries out in dry weather. A seep from the soil stack is tied to someone upstairs using water, and may come with a smell. A seep from a water pipe usually runs whatever the weather and use. The first two cases are usually dealt with by the building as a whole, so the manager should hear of them first. In the flat, a seep on your own branch beyond the stack can be fixed.
Family houses and later blocks side by side
Small houses around Sesku iela and Kārsavas iela
The neighbourhoods portal’s geography section places detached housing around the side streets of Dārzciema iela, such as Sesku iela and Kārsavas iela, and along Ilūkstes iela. The history section says many single-family houses were built here after the Second World War. A common type was the one-storey “inkwell” house with a hipped roof and a central chimney. In such a house the central chimney takes up the middle, so pipes and the water heater may be placed along outer walls or in a kitchen corner. Yard pipes may lie shallower than the groundwater, which in the neighbourhood is mostly at a depth of 1.5–3 m. In old houses water and sewer pipes may have been added later than the house was built, and pipes may run along the floor.
Multi-storey blocks around Vestienas iela and Pildas iela
According to the portal, multi-storey blocks stand in the north around Vestienas, Nīcgales and Vietalvas iela and in the east around Pildas, Strautu and Rēzeknes iela. Wikipedia says that in the 1970s some single-family houses were demolished and blocks of flats built in their place. In places a family house and a block may stand very close, each with its own supply connection and sewer. In a block, work in a flat depends on the risers and the building manager; in a family house it is all up to the owner, right to the yard manhole.
City sewer connection and the application deadline
LV portāls writes that in 2025 Dārzciems owners whose properties already have a central sewer nearby also received municipal co-funding for a sewer connection. For a house joined to the city network, the inside may change too: the old outlet position, the transition from the house pipe to the new connection and sometimes the whole ground floor drain. If the connection is built or being built, it is worth knowing the deadline for applying for co-funding.
Riga City Council binding regulations No. RD-23-207-sn (28 June 2023, as amended), point 7: the co-funding application is submitted no later than three years after completion of the construction works. Source: likumi.lv, viewed on 25 November 2026.
This means the period is counted from the end of the works, so keep the completion documents and invoices together. If the drain starts running slowly after the house is connected, the cause may be the old pipe joined to the new one, not the connection itself. Deposits may have built up over decades in an old cast iron or clay pipe, and they remain after the house outlet is linked to the new connection. Then first clear the blockage and afterwards decide whether to replace the old section.